RECORD 006 / PROOF OF CONTINUITY
Minimum operation

The square was designed for the arrival sequence. When commissioning was deferred, the water circuit was reduced to a single active outlet.
This image was filed as proof of continuity. The order to stop the test is absent from the record.
BUREAU 72
Original release ↗